Home / Cultivation / Banana Calendar of Operations and TNAU Cost of Cultivation (Dated)
Banana calendar of operations and cost of cultivation (TNAU)
TNAU's calendar of operations runs from green manure in month 2 and the first fertiliser dose in month 3 to a second potassium sulphate spray in month 9. TNAU's cost table is undated and priced at Rs 30 per man-day, and its stated total does not match its own table, so use it only as a checklist of cost heads.
How to read this page: every figure is attributed to the ICAR, state-university or National Horticulture Board source named beside it. Recommendations differ between regions and varieties, so confirm the final choice with your KVK or state agriculture department.
Month-by-month (TNAU, per plant)
| Month | TNAU operation |
|---|---|
| 2 | Sow green manure (cowpea or sunnhemp) if needed; slight digging and earthing up |
| 3 | First fertiliser dose 100:300:100 g urea, super phosphate and MOP in basins about 30 cm from the plant |
| 4 | Azospirillum and phosphobacteria with bio-agent and 5–10 kg FYM; leave 2–3 weeks between chemical and bio-fertiliser |
| 5 | Second dose 150:150 g urea and MOP, 300 g neem cake, basins about 45 cm away; remove dried leaves |
| 6 | Dig, earth up, remove dried and diseased leaves; foliar zinc and boron sprays where deficient (0.5%) |
| 7 | Third dose 150:150 g urea and MOP, basins about 60 cm away |
| 8 | After flowering keep one healthy side sucker; 2% potassium sulphate spray; cover the bunch |
| 9 | Second potassium sulphate spray after 30 days; support heavy bunches |
TNAU cost-of-cultivation table (per acre, undated)
| Item (Rs per acre) | Main crop | I ratoon | II ratoon |
|---|---|---|---|
| Land preparation | 1,000 | – | – |
| Digging pits | 6,000 | – | – |
| Manures and chemicals | 4,500 | – | – |
| Fertilisers and transport | 22,000 | 11,000 | 11,000 |
| Planting | 2,000 | – | 2,000 |
| Irrigation | 500 | 300 | 300 |
| Foliar spray and transport | 3,000 | 1,500 | 1,500 |
| Plant protection | 2,500 | 1,250 | 1,250 |
| Stakes and staking | 6,000 | – | – |
| Intercultivation | 2,000 | 1,500 | 1,500 |
| Labour (365 man-days at Rs 30) | 10,950 | 6,500 | 6,500 |
| Harvest, loading, transport | 5,000 | 4,500 | 5,000 |
| Subtotal | 86,450 | 26,550 | 50,050 |
| Total with 5% misc. and 5% insurance | 95,310 | 29,272 | 55,181 |
Do not use these rupee figures to plan. TNAU's labour line uses Rs 30 per man-day, which is far below today's wages. Also, TNAU's own summary quotes a main-crop cost of Rs 1,06,747, but its table totals Rs 95,310, and the three table totals add to Rs 1,79,763 against the Rs 1,91,200 quoted. Use the cost heads as a checklist and enter your own prices in the calculator.
Plan your own dates with the schedule planner.
Questions farmers ask
What operations does TNAU schedule month by month?
Green manure in month 2, the first fertiliser dose in month 3, further doses in months 5 and 7, and potassium sulphate sprays with bunch covering in months 8 and 9.
Can I use TNAU's cost of cultivation figures?
Only as a checklist of cost heads. They are undated, use Rs 30 per man-day, and TNAU's quoted total does not match its own table.
What did TNAU's table give as main-crop cost per acre?
Its table totals Rs 95,310 per acre for the main crop, but the figures are old and should not be used for planning.
Stuck with a problem in your banana field?
Send a photo of the leaves, stem or bunch on WhatsApp with your variety, age and location. Our team replies with what to check and what to do next.
Sources
- TNAU Agritech portal: banana botany, crop production, precision farming, fertigation, IPM (agritech.tnau.ac.in)
- ICAR–National Research Centre for Banana, Tiruchirappalli: varieties, annual reports, technology portal (nrcb.icar.gov.in)
- TNAU Agritech: banana cultivation, calendar of operations and cost of cultivation